Matters needing attention in the construction process of glass blocks

1. After mixing cement, yellow sand, and glue, use the mixed mortar as much as possible within one hour.


2. If the cement needs to be connected with aluminum and stainless steel, a layer of 5㎜ insulation pad should be added between the cement and the connector to avoid direct contact between the cement and the connection [preventing the cement from corroding the metal].


3. Aluminium alloy spirit level should be equipped in the construction, and each layer of glass brick should be biased in time within 2-3 hours.


4. Within 3 hours after the completion of the mixed mortar, the excess mortar in the side seam needs to be cleaned up, the depth is 5-10㎜, which is convenient for the later joint.


5. Needs should be completed within 2-3 hours after mortar masonry.


6. The external wall engineering joints should use No. 425 building white cement as the main material, and add building glue to the white cement to avoid seepage of the side joints.

Latest News

From here you can learn about the latest race information released by Rui Baili, you only need to get our latest newsletter by email。

see more >
Follow Rebeli official WeChat

Way of concern: scan the QR code, or find the WeChat public account "Rebeli"

Copyright © 2018 Dezhou Rebeli Glass Block Co., Ltd.All rights reserved.

Tel:0086-534-2722002 E-mail:info@jhglassblock.com.cn Address: JINGHUA ROAD,ECONOMIC-TECHNOLOGICAL DEVELOPMENT AREA ,DEZHOU CITY,SHANDONG PROVINCE, CHINA